Search
  • Sunriver Airport

Taxiway Project Complete at the Sunriver Airport!


Taxiway Project completed at the Sunriver Airport. The runway was sealed and repainted. Taxiways were built from scratch to new FAA standards. An AWOS was installed and the frequency is 128.325 which went live on October 4th.

112 views

©2019 by Sunriver Airport. Proudly created with Wix.com